FAT

The MV PRESIDENT LB JOHNSON project was successfully delivered

Share to:

On Sep 20, 2024 NSE successfully completed the FAT of CSW Pumps and ER Fans Energy Saving System etc. project of Hull No.: CV55H-6.

The 5500TEU Container Vessel (PRESIDENT LB JOHNSON) was built by Qingdao Beihai Shipbuilding Heavy Industry Co., Ltd. for CMA CGM (China) Shipping Co., Ltd.