The MV DARYA DIYA project was successfully delivered
On Sept 11, 2024 NSE successfully completed the FAT of Main Switchboard /Emergency Switchboard /Battery Charger & Discharge Panel /Group Starter Panel /Individual Starter Panel /Shore Connection Panel /Distribution Board /Test Panel /Push Button Box /C.S.W PUMPS VFD Control System etc. project of Hull No.: NDY1263.
The 63500dwt Bulk Carrier (DARYA DIYA) was built by New Dayang Shipbuilding Co., Ltd. for Chellaram Shipping (Hong Kong) Limited.