The MV ASIAN ENDEAVOUR 1 project was successfully delivered
The MV ASIAN ENDEAVOUR 1 project was successfully delivered.
On Aug. 13, 2019 NSE successfully completed the FAT of 690V/480V Main Switchboard /480V Emergency Switchboard /480V AC MUD MCC /480V AC Drilling MCC /480V AC Ventilation MCC etc. of Hull No.:H1368.
The Jack-up Platform of CJ46 (Hull No.: H1368) was built by Shanghai Waigaoqiao Shipbuilding Co., Ltd. for SINOOCEAN.