The MV LU JI YU YANG 60618 project was successfully delivered

On Nov. 15, 2025 NSE successfully completed the FAT of 690V Main Switchboard /400V/230V Main Switchboard /Emergency Switchboard /Engine Control Console /Bridge control console /Wing Control Console /Measuring Instrument Panel /Tachometer /Main Switchboard etc. project of Hull No.: FFV100K-003.

The Fishery Breeding SHIP (LU JI YU YANG 60618) was built by Qingdao Beihai Shipbuilding Heavy Industry Co., Ltd. for Qingdao Conson development (Group) Co., Ltd.
