The MV ZHONG GU RI ZHAO project was successfully delivered
The MV ZHONG GU RI ZHAO project was successfully delivered.
On Nov. 12, 2018 Shanghai NSE supplied Main Switchboard /Emergency Switchboard /Group Starter Panel /Distribution Boards /Battery Charger & Discharge Panel A&B /Shoer Connection Panel for the vessel.
The 2500TEU Container Vessel (Hull No.: S1249) built by Shanghai Shipyard Co., Ltd. for Zhonggu Shipping Group.