The MV ZHONG GU XIONG AN project was successfully delivered
命名交船.jpg)
The MV ZHONG GU XIONG AN project was successfully delivered.
命名交船2.jpg)
On Sep 13, 2018 Shanghai NSE supplied Main Switchboard /Emergency Switchboard /Group Starter Panel /Distribution Boards /Battery Charger & Discharge Panel A&B /Shoer Connection Panel for the vessel.

The 2500TEU Container Vessel (Hull No.: S1248) built by Shanghai Shipyard Co., Ltd. for Zhonggu Shipping Group.