The six days sea trial for MV ZHONG GU XIONG AN was completed on Aug 24, 2018
The six days sea trial for MV ZHONG GU XIONG AN was completed on Aug 24, 2018.
The 2500TEU Container Vessel (Hull No.: S1248) built by Shanghai Shipyard Co., Ltd. for Zhonggu Shipping Group.
Shanghai NSE supplied Main Switchboard /Emergency Switchboard /Group Starter Panel /Distribution Boards /Battery Charger & Discharge Panel A&B /Shoer Connection Panel for the vessel.