FAT

The projects of Hull No.H1664A was successfully tested by ABS.

Share to:

June 26, 2016,NSE successfully completed the ABS FAT of ERSB/ESB/CSB projects of hull NO. H1664A,  The 174000M³ LNG CARRIER built by hudong zhonghua shipbuilding (group) Co., Ltd. for BG /CNOOC /CLNG.