The five days sea trial for MV XI PAN 3 was completed on Jun. 30,2015.
Share to:
The five days sea trial for MV XI PAN 3 was completed on Jun. 30, 2015. The 2,000m3 marine dredge NT2013-29 was built by NANTONG GANGZHA SHIPPING MANUFACTURING CO.,LTD. for CHANGJIANG WATERWAY ENGINEERING BUREAU. Shanghai NSE supplied 690V MSB/440V MSB for the vessel.