FAT

The three days sea trial for M/V DA LIANG was completed on Sep. 26,2014.

Share to:

The three days sea trial for M/V DA LIANG was completed on Sep. 26, 2014. The 28000DWT HEAVY LIFT VESSEL S1217 was built by SHANGHAI SHIPYARD CO.,LTD for COSCO (GUANGZHOU).     Shanghai NSE supplied MSB/ESB /BCP /PB for the vessel.