The CX4264 project was successfully delivered
The switchboard project(CX4264) for CX53000DWT Bulk Carrier built at CSSC (Chengxi) Shipyard was successfully accepted FAT by the owner and shipyard on May.25th,2010.
The switchboard project(CX4264) for CX53000DWT Bulk Carrier built at CSSC (Chengxi) Shipyard was successfully accepted FAT by the owner and shipyard on May.25th,2010.