FAT

The seven days sea trial for M/V STELLA BELINDA was completed on Sept. 04, 2013.

Share to:

The seven days sea trial for M/V STELLA BELINDA was completed on Sept. 04, 2013. The 82000DWT BULK CARRIER H1280 was built by v for SHANDONG RIZHAO STEEL.   Shanghai NSE supplied MSB/ESB/BCP for the vessel.